The purpose of this consultation is to inform aviation stakeholders of the proposed amendment to Restricted Area R627 Greenbank.
The issue
Defence training activities conducted within Greenbank Training Area generate an aviation hazard footprint that may extend beyond part of the current western boundary of R627.
Defence proposes a minor western extension to the lateral limits of R627 to ensure the published restricted area accurately reflects the area requiring protection. The amendment changes only the lateral limits of the restricted area.
The activity, conditional status, vertical limits, hours of activity and controlling authority remain unchanged.
No published air traffic services routes, VFR routes, instrument flight procedures or aerodrome operations are affected.
Existing separation from Amberley Military CTR is maintained.
Purpose
The Department of Defence requests feedback on a proposal to amend the lateral limits of Restricted Area R627 Greenbank.
Proposal
R627 Greenbank supports Defence training activities within Greenbank Training Area. The current restricted area provides protection to aircraft from hazardous acivitiets occurring within the training area. Review of training activities and associated hazard footprints identified that part of the western hazard area extends beyond the current published restricted area boundary.
Proposed Change Defence proposes a minor permanent amendment to the western boundary of R627 Greenbank. The amendment changes only the lateral dimensions of the restricted area and remains wholly within Defence land. No change is proposed to:
Restricted area status;
Activity description;
Vertical limits;
Hours of activity;
Controlling authority; or
Existing operating arrangements.
Figure 1: Proposed western amendment of Restricted Area R627 Greenbank
Figure 2: Existing R627 in relation to Greenbank Training Area, Amberley Military CTR and surrounding airspace
Proposed DAH amendment
Designation
YMMM/R6XX GREENBANK
Activity
MILITARY NON-FLYING
Lateral limits
274003S 1525550E – 273745S 1525620E
then along POWERLINES 1 – 273831S 1525830E
274031S 1530029E – 274105S 1530029E
then along RAILWAY 7 – 274326S 1525858E
274100S 1525730E – 274048S 1525622E
274003S 1525550E
Vertical limits
SFC - 2000
Hours of activity
DLY 2100-0600 EXC PH or as amended by
NOTAM
Authority
DOTAM RCO Greenbank
Impact on Aviation Users
Assessment undertaken to date indicates the proposal would have a limited and localised effect on surrounding airspace.
does not affect published ATS routes;
does not affect published VFR routes;
does not affect instrument flight procedures;
does not affect aerodrome operations;
maintains existing separation from Amberley Military CTR; and
results in only a minor reduction in available Class G airspace west of the current restricted area boundary.
The practical effect for aviation users is that the published restricted area will more accurately depict the area in which activities hazardous to aircraft may occur. Measures taken to minimise impact During development of the proposal Defence considered options to contain the identified hazard while minimising impacts on surrounding airspace users.