To seek feedback on the proposal to establish a Temporary Restricted Area (TRA) in southern Queensland to support the safe launch of rockets
Dates: 13/04/2026 to 31/07/2026
4 windows per day
Dates: 13/04/2026 to 31/07/2026
4 windows each week day (Monday - Friday) as per the following table:
|
Monday to Friday (AEST) |
|
|
Window 1 |
0800 - 0900 SFC to FL450 |
|
Window 2 |
1000 - 1100 SFC to FL200 |
|
Window 3 |
1200 - 1400 SFC to FL200 |
|
Window 4 |
1500 - 1600 SFC to FL200 |
4 windows each weekend day (Saturday - Sunday) as per the following table:
|
Saturday to Sunday (AEST) |
|
|
Window 1 |
0800 - 0900 SFC to FL450 |
|
Window 2 |
1000 - 1100 SFC to FL450 |
|
Window 3 |
1200 - 1400 SFC to FL450 |
|
Window 4 |
1500 - 1600 SFC to FL450 |
FL200 window details:
Lateral Limits: Within 2.5 NM RADIUS OF 28° 07' 42" S 149°42' 06" E
Vertical Limits: Surface (SFC) to FL200
Controlling Authority: Airservices Australia
FL450 window details:
Lateral Limits: within 7 NM RADIUS OF 28° 07' 42" S 149°42' 06" E
Vertical Limits: SFC to FL450
Controlling Authority: Airservices Australia
Launch windows will be activated by Notice to Airmen (NOTAM) when required.
Please see images below: